Office Building for Gamesa Eólica

The problem of an office building, for research in this case, is generally how to relate visually, from the workstation, with the exterior. The building of Gamesa is located on the outskirts of Pamplona, surrounded by a beautiful green, mountain landscape. Along with other architectural pieces, it goes up in one of those new development areas of showy name, which makes reference to new technologies, and whose buildings are often characterized by a certain in-breeding, a lack of interaction with the exterior.

Office Building for Gamesa Eólica

Office Building for Gamesa Eólica

Office Building for Gamesa Eólica

Office Building for Gamesa Eólica

Office Building for Gamesa Eólica

Office Building for Gamesa Eólica

clic en Imágenes slide-show | clic en centro ampliar imagen | clic en laterales secuencia

The objective of the project is guaranteeing that the building (its users from the interior), is ‘aware’ of the specific ‘place’ where it rises, an area with fantastic views, which it has to make its own. For this reason, the proposal does not conceive the plot as something where the piece must simply rest or something that merely surrounds the building. But quite the opposite: the landscape makes its way into the building which, at the same time, opens up voluntarily. Inside the building, the landscape creates spatial and visual complexities, blurring and enhancing the boundaries between interior and exterior, setting up a rich dialogue. The project includes a large program divided into different functional areas. The exterior perimeter is configured with the offices that must be enclosed. The interior perimeter, flowing onto the large gardened central space, takes on the spatial character of an open-plan office. The volume is materialized and built as an “excavated mineral”. The exterior perimeter, clear and delimited, contrasts with the interior one, broken and surprising. As much the geometry of the building as the glass surfaces used for its construction, laminated in their interior with a steel mesh, able to create reflections and mineral textures in contact with light, stress this idea of “mineral piece”. The exterior facade is a double facade in terms of energy efficiency. All the profiles are made out of galvanized steel. The interior space, sheltered from wind and with views onto the surrounding mountain landscape, is dotted with bamboos. It is a cool place in summer, one that can be enjoyed, and a “lung” that endows the building with natural air conditioning.

Office Building for Gamesa Eólica

Office Building for Gamesa Eólica

Office Building for Gamesa Eólica

clic en Imágenes slide-show | clic en centro ampliar imagen | clic en laterales secuencia

Enlace corto a esta nota:
Los textos publicados son responsabilidad de sus respectivos autores.
Notas Relacionadas

Este artículo no tiene notas relacionadas.

There are no comments yet

comments are open, but there are no comments.

Leave a comment :: Trackback





Recomendanos en google +

Esta semana en Arqa

Notas más populares

Nueva Bombonera
Nueva Bombonera
11 May 12

Memoria Descriptiva Queremos que el nuevo estadio pueda no sólo albergar más hinchas durante los partidos, sino que sea un edificio posible de recorrer los 7 días de la semana, dotando al barrio de un paseo cultural, donde la historia del club y del barrio se entremezclen con propuestas gastronómicas típicas y paseo [...]

Casa BR
Casa BR
21 Jan 08

La casa BR esta ubicada en un barrio cerrado de la zona Norte de la provincia de Buenos Aires. Emplazada sobre la costa del lago y en el único lote doble existente en el barrio, tiene la particularidad de contar con mayor superficie en relación a sus vecinos inmediatos cuyas casas se ubican en lotes simples. La estrategia proyectual [...]

Conjunto residencial Castellana Pinar 4
Conjunto residencial Castellana Pinar 4
27 Nov 08

La actuación obedece a una única iniciativa, que por razones urbanísticas se desdobló en dos intervenciones independientes aunque simultáneas. Mientras el edificio de López de Hoyos es de nueva planta, el de la calle Pinar se proyectó utilizando la estructura ciñéndose al volumen del edificio preexistente. Circunstancia que nos llevó a proyectar un conjunto [...]

Conferencia Adamo – Faiden: “Liga 05: Un Ambiente” BsAs

La misma se realizará en México D.F. el míercoles 23 de Mayo a las 19.30hs. en la Estación Indianilla, Dr Claudio[...]

Conferencia de Carlos Arroyo, en la SCA BsAs

El 28 de mayo de 2012 a las 19 hs, anticipando el Foro Arquitectura + Sustentable, el Arq. Carlos Arroyo brindará la[...]

Batimat Expovivienda 2012 BsAs

La exposición líder de la construcción y la vivienda en la región se realizará del 29 de mayo al 2 de junio de[...]